Please wait...
Planning at Tuesday 23rd April 2024 (Week 17).
 

BAe146 - FAAM

 
 

TEST - FAAM Test and Training

From Monday 11th December 2017 to Friday 15th December 2017

Description

Project theme Project theme: Recommencement of flying following the BAe146 annual maintenance checks and fitting of new instruments. Activities include pilot currency flying, instrument tests, training.

Scientific contact Scientific contact (PI) : Doug Anderson

Project confirmed Project confirmed
Not Transnational Access project Not Transnational Access project
Open to training Open to training
Open to training Open to sharing

Planning and location

Starting date From Monday 11th December 2017 (week 50) to Friday 15th December 2017 (week 50)

Aircraft name Aircraft: BAe146 - FAAM

Season Season: Winter

Location Location: Map Cranfield

Description of the experiment

Scientific objectives / Proposed work / Anticipated output Scientific objectives / Proposed work / Anticipated output

Abstract Aim is to get the aircraft, instruments and people ready for the science flying in Jan-Feb 2018

Science context Preparation for PICASSO and Cold Air Outbreak flying (cloud physics)

Measurements to be made by aircraft All core measurements

Weather constraints Weather conditions: Cloud

Flights (number and patterns) Flights (number and patterns): UK-based flying 1 or 2 x pilot currency flights 1 or 2 instrument test and training flights

Instruments Instruments: Core instruments

 

FA20 - DLR

 

FA20 - SAFIRE

 

Learjet - Enviscope

 

ATR42 - SAFIRE

 

POLAR 5 - AWI

 

ANT 2017/18 - Airborne geophysical surveys and remote sensing as well as logistic support of field teams and stations

From Monday 6th November 2017 to Saturday 24th February 2018

Description

Project theme Project theme: Several projects for mapping ice thickness, magnetic and gravity field, altimetry, and photography

Scientific contact Scientific contact (PI) : None

Project not confirmed Project not confirmed
Not Transnational Access project Not Transnational Access project
Open to training Open to training
Open to training Open to sharing

Planning and location

Starting date From Monday 6th November 2017 (week 45) to Saturday 24th February 2018 (week 08)

Aircraft name Aircraft: POLAR 5 - AWI

Location Location:

Novo runway, Neumayer station, Kohnen Station, field camps, all Antarctica

Description of the experiment

Scientific objectives / Proposed work / Anticipated output Scientific objectives / Proposed work / Anticipated output

Science context Polar Regions, geophysics and glaciology

Measurements to be made by aircraft - ice penetrating radar - magnetics - gravity - laser scanning - photography

Flights (number and patterns) Flights (number and patterns): 20-30 flights, max 160 h

Instruments Instruments: None

 

C 208 - DLR

 

CASA 212 AR - INTA

 

CASA 212 RS - INTA

 

DO228 - NERC - ARSF

 

DO228/D-CFFU - DLR

 

DO228/D-CODE - DLR

 

STEMME S15 - INTA

 

Twin Otter - NERC - BAS

 

C 207 - FUB

 

C 208 - ATHENA/RIC

 

ECO Dimona - UEDIN

 

ENDURO - KIT

 

ERAs - CNR ISAFom

 

PIPER AZTEC - SAFIRE

 

Partenavia - Enviscope

 

TASI Partenavia IMAA

 

ASK16 - FUB

 

An 2 - Interspect

 

BN-2A-27

 

BNI - MUMM

 

C 182J - UM SEAES

 

C 208 - Enviscope

 

CITATION - NLR

 

Cessna182 - Interspect

 

DA42MPP - DAS

 

DIMO - METAIR

 

DO128 - TUBs

 

ENDURO - UFZ

 

ERA - INES LU

 

ERA SkyArrow - IBIMET

 

Egrett - ARA

 

G550 HALO - DLR

 

IL 18D - CAO

 

IronEye - UNIFI

 

King-Air - INCAS

 

King-Air - TAU

 

M55 - Geophysica

 

METRO II - NLR

 

PA-32 Cherokee Six - Interspect

 

PZL 101 Gawron - Interspect

 

Seneca - IBIMET

 

Seneca - OGS

 

TU-154 FACT - GFRI

 

Zeppelin LZ N07-100

Planning at Tuesday 23rd April 2024 (Week 17).